EasyManua.ls Logo

GE AKTA ready - 4 Installation

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Installation
About this chapter
This chapter describes how to transport and install ÄKTA ready.
ÄKTA ready is designed for ease-of-use. As a consequence, the system is easy to install
and setup for the first run. Most of the components are mounted on the system cabinet
or on the flow kit.
There are few loose parts that require assembling or mounting, and the physical connec-
tions are simple and straightforward. Installation should, however, always be performed
by experienced personnel authorized by GE Healthcare.
Apart from a suitable environment for the instrument, the prerequisites for installation
of ÄKTA ready include outlets for electrical power and compressed air, and access to a
computer. Some tools are required for unpacking the instrument, and test liquids must
be prepared.
Precautions
WARNING
Before attempting to perform any of the procedures described in
this chapter, you must read and understand all contents of the
corresponding section(s) in the Section 2.1 Safety precautions, on
page 15 as listed below:
Installing and moving, on page 17
Personal protection, on page 16
NOTICE
ÄKTA ready shall be installed and prepared by personnel from GE
Healthcare or third party authorized by GE Healthcare.
Contact GE Healthcare if you require re-installation at a new site.
ÄKTA ready Operating Instructions 28960345 AD 55
4 Installation

Table of Contents

Related product manuals