EasyManua.ls Logo

GE AKTA ready - 14.6 Checklists

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14.6 Checklists
Performed tasks checklist
RemarkSignCheckStep
Contents according to
packing list?
1 Unpacking
No visible damage on the
system?
System unit positioned with
sufficient surrounding
space, and power switch
and emergency stop easily
accessible (see Section 4.5
Positioning the system, on
page 66)?
2 Installation,
system unit
Wheels of system unit
locked (see Section 4.5 Posi-
tioning the system, on
page 66)?
Connected to computer (see
Computer, on page 69)?
Compressed air connected
(see Compressed air, on
page 67)?
Mains power correctly con-
figured (see Power, on
page67) and cable connect-
ed to source?
216 ÄKTA ready Operating Instructions 28960345 AD
14 Reference information
14.6 Checklists

Table of Contents

Related product manuals