EasyManua.ls Logo

GE AKTA ready - Block 1: Opening Valves

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.2.2 Block 1: Opening valves
The first block in the method will open valves in the flow path:
ActionStep
In the Method Editor. click New on
the Block menu.
1
In the New Block dialog box shown,
give the block a name, for example
MySetup, and set the Base to Time.
The From: field under Call has the
value Main (which is the only one
available initially).
2
The new block will show up in the
Text pane with the specified name
and base.
Insert an instruction that opens the valve for inlet 6: In the Text pane, select
the Base instruction and, in the Instruction Box, set the Inlet instruction
(under FlowPath) to Inlet 6. The Breakpoint time should be 0.00. Insert the
instruction into the block by clciking Insert.
3
The new instruction will show up in
the Text pane below Base.
154 ÄKTA ready Operating Instructions 28960345 AD
10 Creating a method
10.2 An example of using the Method Editor
10.2.2 Block 1: Opening valves

Table of Contents

Related product manuals