EasyManua.ls Logo

GE AKTA ready - 6.2 Unpacking the flow kit

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.2 Unpacking the flow kit
Flow kit package
To protect against contamination, ÄKTA ready flow kits are delivered in double plastic
bags.
The flow kit package contains the following items:
The main part of the flow kit and the inlet manifold (6 inlets). The main part includes
air trap, column connection tubing, sensor flow cells, and outlet manifold (6 outlets).
The pump tubing, including 2 TC clamps with gaskets.
Vaseline.
A binder containing product documentation for the flow kit.
Unpack flow kit
Unpack ÄKTA ready flow kits as follows:
ActionStep
Cut open the outer plastic bag in a clean environment near the ÄKTA ready,
for example in the air lock, if the system is in a clean room.
1
Take out the inside plastic bags and move them together with the other flow
kit equipment to the system cabinet. Open the bags immediately before
mounting the flow kit onto the system cabinet.
2
In addition to the plastic wrappings, ÄKTA ready flow kits are equipped with
plastic end caps protecting the connectors from contamination. Do not remove
any of the end caps until it is time to connect the flow kit to buffer bags/tanks
and to column, which are the last steps in the mounting procedure (see Sec-
tion 6.3 Mounting the flow kit, on page 81 and Section 9.2 Installing a column,
on page 127).
Note:
Labeling of flow kits
The different parts of the ÄKTA ready flow kits are labeled and equipped with bar codes.
The bar codes are primarily used for traceability. ReadyToProcess Columns have bar
codes for the same purpose.
80 ÄKTA ready Operating Instructions 28960345 AD
6 Flow kit installation
6.2 Unpacking the flow kit

Table of Contents

Related product manuals