EasyManua.ls Logo

GE AKTA ready - Page 63

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Center of gravity
The center of gravity for ÄKTA ready is indicated with a dashed and dotted, vertical line
in the drawings below.
The line is located slightly towards the back of the cabinet. This must be taken
into consideration when moving or lifting the cabinet.
Note:
ÄKTA ready Operating Instructions 28960345 AD 63
4 Installation
4.3 Transport

Table of Contents