EasyManua.ls Logo

GE AKTA ready - Page 82

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before starting
System setup
In UNICORN 5 the component list is reached by clicking System Setup on the Admin-
istration menu in the UNICORN Manager
In UNICORN 7, in the Administration module, click System Properties and then click
Edit in the System Properties dialog box.
Select the Profibus_Config5 or Profibus_Config6 checkboxes. If you have installed the
gradient system both the Äkta_Ready_Gradient checkbox and the Profibus_Config6
checkbox must be selected.
You should also select the pH_Cell checkbox if pH is to be measured, the correct flow
kit size (the LowFlow_Kit checkbox, default, or the HighFlow_Kit checkbox), type of air
sensor (the Air_AE151 or the Air_AE152 checkbox). By selecting the Service checkbox
you will have the possibility to display UV_131_S and UV_131_R in RunData.
TC clamps
Two TC clamps are provided with the flow kit. An additional three clamps are required
in order to mount the flow kit and run a component test.
Aseptic solution
A suitable disinfectant solution should be available for aseptic treatment of tubing con-
nectors. Connectors can, for instance, be treated with 70% Ethanol before connecting.
82 ÄKTA ready Operating Instructions 28960345 AD
6 Flow kit installation
6.3 Mounting the flow kit

Table of Contents

Related product manuals