Open the installation wizard
ActionStep
1
UNICORN 5: In the ÄKTA ready System Control module, on the File menu,
click Instant Run and then click Run in the dialog box shown.
UNICORN 7: In the ÄKTA ready Method Editor module, on the File menu,
click New Method. Click Method Wizard in the New Method dialog box
and then click OK.
In the wizard, click Flow kit Installation with Component Test. Installation
of a new flow kit normally includes a component test.
2
Select the Print Report Automatically checkbox if you want to automatically
print a report with installation information and test results.
Note:
A printed report can also be produced later. In the Evaluation module, on the
File menu, click Report.
3
In UNICORN 7 the installation wizard creates a new method. Save the method
and then run it in the System Control module.
4
84 ÄKTA ready Operating Instructions 28960345 AD