EasyManua.ls Logo

gefran ADV200 SP Series - Page 52

gefran ADV200 SP Series
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52 ADV200 SP • Quick start up guide - Specification and installation
Step 1 - Connections
1. Connect the solar panels to the inverter DC-Link (see section “5.5 Typical connection diagrams”, page

2. Connect the centrifugal pump actuator motor to the inverter (see section “5.1.7 Motor connection”, page

3. 

Connection of the drive enabling contact
R21R24 56C1 78910 11 12 C2 C3 S3
R11R14 123
4
S1+S1- 13 14 IS1IC1
IC2
IS2
Enable

R21R24 56C1 78910 11 12 C2 C3 S3
R11R14 123
4
S1+S1- 13 14 IS1IC1
IC2
IS2
Enable
54321
Strip T2 (Regulation terminals)Safety Input / Output connector
Strip T1 (Regulation terminals)
4. 
Check that the power supply voltage is in the 450 ... 75 range.
Check that the Drive output terminals (U, V and W) are properly connected to the motor.
Check that all the terminals in the drive control circuit are properly connected. Check that all control
inputs are open.

to the next step in the procedure.
Powering the drive
 

Table of Contents

Related product manuals