EasyManua.ls Logo

Goodwe GW10K-ES-C10 - Detailed System Wiring Diagram for Parallel System

Goodwe GW10K-ES-C10
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58
6.2.2 Detailed System Wiring Diagram for Parallel System
In parallel scenarios, the inverter connecting to Ezlink and smart meter is considered as
the master inverter, while all the others are slave inverters. Do not connect any smart
dongle to the slave inverters.
Generator is not supported in parallel system.
The following diagram mainly introduces parallel connections. For other port
connections, refer to the single system.
Use GM330 in the system

Table of Contents

Related product manuals