EasyManua.ls Logo

Goodwe GW10K-ES-C10 - Setting Load Control

Goodwe GW10K-ES-C10
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
149
7
Maximum Operation
Voltage
Set the upper limit of operating voltage for the generator.
8
Minimum Operation
Voltage
Set the lower limit of operating voltage for the generator.
9
Upper Limit Of
Operating Frequency
Set the upper limit of operating frequency for the
generator.
10
Lower Limit Of
Operating Frequency
Set the lower limit of operating frequency for the
generator.
11
Delay Before Load
The no-load preheating time before the generator is
loaded.
9.4.6 Setting Load Control
This function supports settings through the SolarGo APP only.
Step 1: After connecting to the SolarGo APP, enter the parameter setting interface through
Home > Settings > Port Connection > Load Control.
Step 2: Enter the parameters and tap . The parameters are set successfully.
Number
Parameter
Description
1
Dry Contact Mode
The loads will be powered within the setting time period.
when the switch is ON, the loads will be powered; when the
switch is OFF, the power will be cut off. Turn the switch on
or off based on actual needs.
2
Time Mode
set the time to enable the load, and the load will be
powered automatically within the setting time period.
3
SOC mode
the inverter has an integrated relay controlling port, which
can control the loads off or on. In off-grid mode, the load
connected to the port will not be powered if the BACKUP
overload is detected or the battery SOC value is lower than
the Off-grid battery protection value.

Table of Contents

Related product manuals