3.Refer to the following table to check out the minimum construction area. 
Ceiling type    Wall mounted type    Floor standing type 
Weight(kg) 
Area(m
2
) 
Weight(kg) 
Area(m
2
) 
Weight(kg) 
Area(m
2
) 
<1.224 
— 
<1.224 
— 
<1.224 
— 
1.224  0.956  1.224  1.43  1.224  12.9 
1.4  1.25  1.4  1.87  1.4  16.8 
1.6  1.63  1.6  2.44  1.6  22.0 
1.8  2.07  1.8  3.09  1.8  27.8 
2.0  2.55  2.0  3.81  2.0  34.3 
2.2  3.09  2.2  4.61  2.2  41.5 
2.4  3.68  2.4  5.49  2.4  49.4 
2.6  4.31  2.6  6.44  2.6  58.0 
2.8  5.00  2.8  7.47  2.8  67.3 
3.0  5.74  3.0  8.58  3.0  77.2 
3.2  6.54  3.2  9.76  3.2  87.9 
3.4  7.38  3.4  11.0  3.4  99.2 
3.6  8.27  3.6  12.4  3.6  111 
3.8  9.22  3.8  13.8  3.8  124 
4.0  10.2  4.0  15.3  4.0  137 
4.2  11.3  4.2  16.8  4.2  151 
4.4  12.4  4.4  18.5  4.4  166 
4.6  13.5  4.6  20.2  4.6  182 
4.8  14.7  4.8  22.0  4.8  198 
5.0  16.0  5.0  23.8  5.0  215 
5.2  17.3  5.2  25.8  5.2  232 
5.4  18.6  5.4  27.8  5.4  250 
5.6  20.0  5.6  29.9  5.6  269 
5.8  21.5  5.8  32.1  5.8  289 
6.0  23.0  6.0  34.3  6.0  309 
6.2  24.5  6.2  36.6  6.2  330 
6.4  26.1  6.4  39.1  6.4  351 
6.6  27.8  6.6  41.5  6.6  374 
6.8  29.5  6.8  44.1  6.8  397 
7.0  31.3  7.0  46.7  7.0  420 
7.2  33.1  7.2  49.4  7.2  445 
7.4  34.9  7.4  52.2  7.4  470 
7.6  36.9  7.6  55.1  7.6  496 
7.8  38.8  7.8  58.0  7.8  522 
8.0  40.8  8.0  61.0  8.0  549 
4. Operation Tools 
The following tools will be used: 1) Liquid-level gauge; 2) Screwdriver; 3) Electric driven rotary hammer; 4) 
Drill; 5) Pipe expander; 6) Torque wrench; 7) Open-end wrench; 8) Pipe cutter; 9) Leak detector; 10) Vacuum 
pump; 11) Pressure gauge; 12) Universal meter; 13) Hexagon wrench; 14) Tapeline.