(3)   If the measured voltages between UP, VP, WP, NU, NV, NV are all among 0.3V-0.7V, then it indicates the 
IPM module is normal; If any measured valve is 0, it indicates the IPM is damaged. 
3.2.2.2 Method of Testing PFC Module Short Circuit(only for GUD100W/NhA-T, GUD125W/NhA-T, 
GUD140W/NhA-T) 
(1)   Preparation before test: prepare a universal meter and turn to its diode option, and then remove the wires 
L1-2, L2-1 after it is powered off for one minute. 
(2)   Testing Steps: 
Step 1: Put the black probe on the place P and the red one on the wiring terminal L1-2, L2-1respectively as 
shown in the following figure to measure the voltage between L1-2 and P; L2-1 and P. 
Step 2: Put the red probe on the place N and the black one on the wiring terminal L1-2, L2-1respectively as 
shown in the following figure to measure the voltage between N L1-2 and NL2-1. 
(3)   If the measured voltages between L1-2 and P; L2-1 and P, N and L1-2, N and L2-1 are all among 0.3V-0.7V, 
then it indicates the PFC module is normal; If any measured valve is 0, it indicates the PFC is damaged. 