22
Figure 27 Connecting the power cord for a PSR75-12A power module (1)
Figure 28 Connecting the power cord for a PSR75-12A power module (2)
Verifying the installation
After you complete the installation, verify the following items:
There is enough space for heat dissipation around the switch, and the rack or workbench is
stable.
The grounding cable is securely connected.
The power source is as required by the switch.
The power cords are correctly connected.
If part of the network cable for a port is routed outdoors, verify that a network port lightning
protector is used for the port.
If a power line is routed from outdoors, verify that a surge protected power strip is used for the
switch.