4 - System setup
4.4
Initial system start-up
The HC 6500 system with basic tractor equipment and sprayer control
unit.
1. Terminal HC 6500.
2. SetBox HC 6400.
3. Grip HC 6300.
4. To Jobcom HC 6100 on sprayer.
5. Printer connection DB 9 COM1/COM2 port.
6. DB 25 connector harness with power and CAN communication.
7. Tractor harness.
8. Connector for tractor to Jobcom HC 6100.
9. Power from tractor battery with a 25 amp fuse.