EasyManua.ls Logo

Hitachi Compute Blade 2500 - Intended Audience; Product Version

Hitachi Compute Blade 2500
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
environment might be greater than that of the ambient room
temperature. Be careful not to exceed the rated maximum
ambient temperature of the unit.
¢
Reduced air flow
When installing equipment in a rack, be careful that the amount of
airflow required for safe operation of the equipment is not
compromised.
¢
Mechanical loading
When mounting the equipment in a rack, be careful to avoid
hazardous conditions caused by uneven mechanical loading.
¢
Circuit overloading
When power is being supplied to equipment, be careful of
excessive current causing circuit interruptions and overheating of
power cables. When using the equipment, carefully note the
ratings.
¢
Reliable grounding
Maintain reliable grounding of rack-mounted equipment. Pay
particular attention to non-grounded power connections to branch
circuits (for example, in power strips).
Intended Audience
This document is intended for the personnel who are involved in planning,
managing, and performing the tasks to prepare your site for Compute Blade
installation and to install the same.
This document assumes the following:
The reader has a background in hardware installation of computer
systems.
The reader is familiar with the location where the Compute Blade will be
installed, including knowledge of physical characteristics, power systems
and specifications, and environmental specifications.
Product Version
This document revision applies to support for Windows 10.
Preface
xv
Hitachi Compute Blade 2500 Series Getting Started Guide

Table of Contents

Other manuals for Hitachi Compute Blade 2500

Related product manuals