2.1
INSTALLATION
Chapter Two
Installation
WARNING:
Service Installation Only
GENERAL
The ThinPrep
®
Integrated Imager must be installed by Hologic service personnel. When
installation is complete, Hologic personnel train the operator(s), using the operator’s manual as
the training guide.
ACTION UPON DELIVERY
Remove and read the
Operating Instructions Prior to Installation
sheet attached to the packing
carton.
Inspect the packing cartons for damage. Report any damage immediately to the shipper and/or
Hologic
Technical Support as soon as possible. (Refer to Chapter 7, Service Information.)
Leave the instrument in the packing cartons for Hologic service installation.
Store the instrument in a suitable environment until installation (cool, dry, vibration-free area).
Note:
The computer manufacturer provides documentation for the PC. Refer to that for technical
specifications. Do not discard.
PREPARATION PRIOR TO INSTALLATION
Pre-Installation Site Assessment
A pre-installation site assessment is performed by Hologic service personnel. Be sure to have
prepared any and all site configuration requirements as instructed by the service personnel.
The Integrated Imager will require two outlets to power the instrument. Make sure there is
adequate electrical supply within 2 meters of the instrument. It must be plugged into a three-prong
grounded outlet. Disconnection from the power supply source is by removal of the power cord.
Note:
Do not position the instrument so that it is difficult to disconnect the power cords.