Step For details, see…
6. Providing power to the system: AC
power supply and backup
batteries. This includes connecting
the AC power supply to the
cabinet’s power adapter,
calculating the control panel load
anddetermining the
corresponding required backup
battery capacity, andinstalling the
batteries.
Powering the System on page106.
Note
You must install at least
1battery.
7. Registering the control panel in
MAXPRO Cloud using the panel's
MAC address.
Connecting to MAXPRO Cloud on
page119.
8. Applying power to the system
(switching on the AC power
supply).
9. Configuring the control panel, and
registering andconfiguring other
devices in MAXPRO Cloud.
Configuration in MAXPRO Cloud on
page124.
10. Changing the default user codes
for the keypads (Installer and
Master PIN code).
MAXPRO Cloud online help
11. Testing and commissioning the
system.
Testing and Commissioning on
page142.
Caution!
To get the system up and running, it is recommended to install the
control panel in the cabinet, connect all peripherals, and register the
panel in MAXPROCloud before finally powering the system.
Caution!
Use cable ties to bundle and fix wiring. The cabinet, the device's
individualenclosures, and the PCB holders all have various
attachments point for this purpose.
22 800-23044 Rev. A draft_11
Installation and Setup Guide Honeywell MAXPRO Intrusion MPIP2000U/3000U Series