EasyManua.ls Logo

horsch FOCUS ST - Checks

horsch FOCUS ST
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checks
The quality of drilling work essentially depends
on settings and inspections.
¾ Before starting sowing you should therefore
carry out all maintenance and service work.
¾ Drilling must be checked when starting work
and, in case of larger 󰘰elds also regularly in
between!
Machine
¾ Has the machine been hitched up correctly
and are the coupling devices locked?
¾ Have the tractor link arms being locked
against swinging sideways?
¾ Has the tractor link arm hydraulics been
switched to position control mode?
¾ Have the bout markers been set to the cor-
rect length?
¾ Has the machine been levelled and the drilling
depth correctly adjusted?
Cultivation tools
¾ Are coulters, harrows (wear items) and other
cultivation tools and optional equipment still
in a serviceable state?
¾ Do the coulters have su󰘲cient pretension and
do they all rotate freely?
¾ Are the scrapers still in good condition and
correctly adjusted?
Pneumatic system
Fan
¾ Is the hydraulic fan connected to a pressure
free return 󰘱ow?
¾ Are fan and intake grill clean?
¾ Is the fan tightly mounted on the shaft?
¾ Are fan speed and drive pressure not ex-
ceeded? Pay attention to the sticker for fan
speeds.
¾ Is the metering unit equipped with the correct
cell wheel and is the sealing lip still in good
working order?
¾ In the case of small seed, has the cleaning
brush been installed and is it in order?
¾ Is, especially in the case of small seed, the
correct seed quantity being distributed?
¾ In the case of large seed, has the scraper
been installed?
¾ Are all connections, clearing valve and hopper
tightly closed?
¾ Is seed coming out of all coulters?
¾ Are bridges forming in the hopper (particularly
with husky seed)?
Metering unit
¾ Is the metering unit equipped with the correct
cell wheel and is the sealing lip still in good
working order?
¾ In the case of small seed, has the cleaning
brush been installed and is it in order?
¾ Is, especially in the case of small seed, the
correct seed quantity being distributed?
¾ In the case of large seed, has the scraper
been installed?
¾ Are all connections, clearing valve and hopper
tightly closed?
¾ Is seed coming out of all coulters?
¾ Are bridges forming in the hopper (particularly
with husky seed)?
Hose system
¾ Are tram line valves installed in the correct
seed lines for the tram lines?
Tram line valves on distributor tower
¾ Has the tram line rhythm been adjusted and
do the motorised valves close?
¾ Are the seed lines for tram lines completely
closed and completely opened?
¾ Are the seed hoses free of sagging, water and
other deposits?
¾ Are all air lines between fan and coulters leak
tight and 󰘰rmly connected?
¾ Does air 󰘱ow uniformly out of all coulters?
¾ Does the seed not bounce out of the seed
furrow, or does it remain in the pipes and
cause blockage?
55

Table of Contents

Related product manuals