100 Kilo Sliding Shelf kit 16
7.
Secure the opposite end of the cable management arm to the rack using two M6 x 12 pan HD screws
and M6 external washers.
Installation is complete.
Using the 100 Kilo Sliding Shelf
Use the handle on the front of the sliding shelf to slide it in and out of the rack. When sliding the shelf back
into the rack, there may be resistance. Apply pressure as needed to fully move the shelf into the rack.
IMPORTANT:
Be sure to secure all rack mount system components when moving the shelf out of
the rack.

Table of Contents

Other manuals for HP 10000 G2 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP 10000 G2 Series and is the answer not in the manual?

HP 10000 G2 Series Specifications

General IconGeneral
Rack Height42U
Weight Capacity2000 lbs
ColorBlack
Product TypeRack
MaterialSteel
Adjustable Leveling FeetYes
Cable ManagementYes
Mounting TypeFloor-standing
Width24 inches
Height78.7 inches
Compatible DevicesHP Servers

Related product manuals