Airflow Optimization kit 18
3.
Insert the foam rail gasket into the space between the 19-in mounting rails and the vertical frame on both
sides of the rack, with the closed cell side of the foam rail gasket facing the front of the rack.
4. Gently push the foam rail gasket into the space until it is flush with the vertical frame.
Installing foam rail gaskets between racks
CAUTION:
The foam rail gasket must be installed into the rack before two or more racks can be
bayed together. For additional information on baying racks, see the HP Baying Rack Option Kit.
If installing the foam rail gasket between racks that have a baying kit installed, the baying bracket must be
removed before the foam rail gasket can be inserted between the racks.
1. Position the racks side by side.
2. Cut the foam rail gasket to fit the size of your rack.

Table of Contents

Other manuals for HP 10000 G2 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP 10000 G2 Series and is the answer not in the manual?

HP 10000 G2 Series Specifications

General IconGeneral
Rack Height42U
Weight Capacity2000 lbs
ColorBlack
Product TypeRack
MaterialSteel
Adjustable Leveling FeetYes
Cable ManagementYes
Mounting TypeFloor-standing
Width24 inches
Height78.7 inches
Compatible DevicesHP Servers

Related product manuals