EasyManua.ls Logo

HP 10000 G2 Series - Page 53

HP 10000 G2 Series
129 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ground Bonding kit 53
4.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the cable
access panel and tighten.
From the system chassis rail to the rack top:
1. Insert a T-25 Torx screw through one end of a 15.24-cm (6-in) grounding strap, and secure it to the
system chassis rail.
2. Place the other end of the same grounding strap over the grounding lug on the rack top.
3. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top
and tighten.
From the grounding lug on the rack top to the grounding lug on the perforated panel:
1. Place one end of a 36.83-cm (14.5-in) grounding strap over the grounding lug on the rack top.
2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top
and tighten.
3. Place the other end of the same grounding strap over the grounding lug on the perforated panel.

Table of Contents

Other manuals for HP 10000 G2 Series

Related product manuals