Removal and replacement procedures 57
o
4—DC power
o 5—Single Phase Intelligent PDU
7. Install all VC Ethernet modules, VC-FC modules, and all other interconnect modules in the same bay they
were removed from.
8. Reconnect all cables to those modules to the same ports they were removed from.
9. Wait two minutes.
10. Install all the server blades into the same bays they were removed from.

Table of Contents

Other manuals for HP BladeSystem c7000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP BladeSystem c7000 and is the answer not in the manual?

HP BladeSystem c7000 Specifications

General IconGeneral
Form Factor10U
Number of Bays16
Redundant PowerYes
Redundant FansYes
Maximum Blade Servers16 half-height or 8 full-height
Operating Temperature10° to 35°C (50° to 95°F)
Power SuppliesUp to 6
Cooling Fans10
ManagementOnboard Administrator
Interconnect ModulesUp to 8
Networking OptionsEthernet, Fibre Channel, InfiniBand
CompatibilityHP ProLiant and Integrity server blades
Relative Humidity10% to 90% (non-condensing)