Hardware options installation 103
o
Connected to the onboard x4 SATA connector
12. Install the access panel (on page 28).
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server ("Powering up the server" on page 26).
Two-bay SFF rear drive cage option
For rear drive cage installation, the front bays must be fully populated using the 12 LFF or 24 SFF drives.
High performance fans must be installed in all fan bays.
To install the component:
1. Power down the server (on page 26).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
o Extend the server from the rack (on page 26).
o Remove the server from the rack (on page 27).
4. Remove the access panel (on page 27).
5. Remove the secondary riser cage or PCI blank: