Issue Date Description
19 2018-07-02 This issue is the nineteenth official release,
and includes the following changes:
l Modified 3.7 Installing Management
Modules.
l Modified 3.8 Installing Switch Modules
or Pass-Through Modules.
l Modified 3.11 Installing the PGND Cable
and Power Cables.
l Modified 3.12 Installing Signal Cables.
18 2018-05-29 This issue is the eighteenth official release,
and includes the following changes:
l Modified 6.3.1 Before You Start.
l Modified 6.3.2 Applying for a License
(Only for the CX210 and CX912).
l Modified 6.3.8 Importing and
Transferring Licenses (Only for the
CX210 and CX912).
17 2018-02-28 This issue is the seventeenth official release,
and includes the following changes:
Modified 5.4 Configuring Compute Nodes.
16 2017-04-14 This issue is the sixteenth official release, and
includes the following changes:
l Added 8 Expanding the E9000 Capacity.
l Added the nameplate information of the
2000 W Titanium PSU to 2.5.2 AC PSU.
l Modified the Altitude parameter in 2.8
Technical Specifications.
15 2016-11-22 This issue is the fifteenth official release, and
includes the following changes:
Added the description about the working
temperature compliance with the ASHRAE
Class A3 standard in 2.8 Technical
Specifications.
14 2016-07-11 This issue is the fourteenth official release, and
includes the following changes:
l Added 6.7 Replacing the Chassis.
l Modified 6.2 Replacing a Compute Node
and Components.
l Modified 6.3 Replacing a Switch Module.
13 2015-03-31 This issue is the thirteenth official release.
E9000 Server
User Guide
About This Document