Issue Date Description
04 2013-08-30 This issue is the fourth official release, and
includes the following changes:
l Modified 3.4 Installing the Chassis by
adding the installation of adjustable guide
rails.
l Added 3.5 Installing a Fan Module.
l Added 3.6 Installing a PSU.
l Added 3.7 Installing a Management
Module.
l Added 3.8 Installing a Switch or Pass
Through Module.
l Added 3.9 Installing a Half-width
Compute Node.
l Added 3.10 Installing a Full-width
Compute Node.
03 2013-06-20 This issue is the third official release, and
includes the following changes:
l Added 2.6.4 Fan Module Configuration
Rules.
l Modified the names of service planes in
this document.
l Modified 3.11 Installing the PGND Cable
and Power Cables by adding technical
specifications of the power cables and
updating the figure of installing the DC
power cables.
l Modified Default Information.
02 2013-04-01 This issue is the second official release, and
includes the following changes:
Added 3.2 Unpack the Chassis Packing
Case.
Modified 2.4 Hardware Structure by
updating the component numbers marked in
the hardware structure figure.
Modified 5.5 Configuring the Switch
Modules by adding the configurations of the
CX310, CX311, CX312, and CX110.
Deleted Architecture.
Deleted Technical Specifications from 2.5.2
AC PSU, 2.5.3 DC PSU, and 2.6.2 Fan
Modules, and added the technical
specifications to 2.8 Technical Specifications.
01 2013-01-04 This issue is the first official release.
E9000 Server
User Guide
About This Document
Issue 25 (2019-11-30) Copyright © Huawei Technologies Co., Ltd. vi