EasyManua.ls Logo

Huawei FusionDC1000A - Page 111

Huawei FusionDC1000A
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Check Item Check
Method
Expected Result
6 Cable connections Observe All cable connections are secure,
especially network cable
connections.
Bear cables and terminal barrels
near wearing terminals are
wrapped in insulation tape or heat
shrink tubing.
Flat washers and spring washers of
all wiring terminals are securely
installed.
Cables are routed in the way
convenient for future maintenance
and expansion.
Cabinets are clean and have no
dust, excessive cable ties, cable
cuts, or other foreign matter inside.
7 Cable binding Observe Cables are neat and not coiled, and
excessive parts are cut.
Cable ties do not overlap, and the
joints are evenly cut without burrs.
Cables are placed properly and not
tense at turning points.
Cable routes are straight and
smooth, and do not intersect inside
a cabinet.
8 Installation of
external
accessories
Observe The number and positions of external
accessories installed conform to
design requirements.
9 Labels Observe All labels are correct, clear, and
complete.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 11 Installation Verication
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 104

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals