EasyManua.ls Logo

Huawei FusionDC1000A - Fire Detection for Lithium Battery Modules; Acronyms and Abbreviations

Huawei FusionDC1000A
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Installing Cables Outside the Pre-fab.
Module
9.1 Connecting Input Power Cables for the Pre-fab.
Module
Preparations
Tools: crimping tool, Phillips screwdriver, adjustable wrench, cable cutter, heat gun
Materials: cable tie, cable, terminal, heat shrink tubing
Skill requirement: skilled technician
Procedure
Step 1 Open the door of the power PDB.
Step 2 Remove the plugs from the two cable holes at the bottom of the power PDB.
Figure 9-1 Removing the plugs from the cable holes
Step 3 Remove the transparent cable protection panel from the power PDB busbar.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 9 Installing Cables Outside the Pre-fab. Module
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 97

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals