EasyManua.ls Logo

Huawei FusionDC1000A - Cabinet Base; External Ports

Huawei FusionDC1000A
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Installation Preparations
Before the installation, unpack and check the products, take out auxiliary
materials (for details, see the packing list) from the cabinets, make available all
required technical documents, tools, and materials, check the installation
environment, drill holes based on the installation positions,
x the pre-fab. module
bases, and train onsite installation personnel.
3.1 Obtaining Tools and Materials
Table 3-1 Tools and materials
Catego
ry
Tools and Materials
Tighteni
ng tools
Phillips screwdriver
(M5, M6, and M8)
Flat-head screwdriver
(2–5 mm)
Phillips screwdriver
M4 (length < 100
mm)
Phillips screwdriver
M8 (length = 200
mm)
Solid wrench Adjustable wrench
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 3 Installation Preparations
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 23

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals