4.2.3 Hoisting and Securing the Pre-fab. Module
Prerequisites
To facilitate subsequent installation, ensure that the pre-fab. module is level after
hoisting.
● Pre-fab. module bases have been installed and leveled.
● Select an appropriate crane based on standards of the crane company, and
ask a professional to assess the crane onsite.
● Twistlocks in pre-fab. module bases are in correct positions.
● The hoisting ropes are available.
● The doors of the pre-fab. module to be hoisted are closed.
● The weather is good without wind when a pre-fab. module needs to be
hoisted outdoors.
Context
Ensure that the crane and steel ropes can bear the load weight.
Table 4-3 Parameters for hoisting a pre-fab. module
Weight
Steel
Rope
Length
Steel Rope
Quantity
Dimensions (H x W x D)
Net weight: <
14,000 kg
> 12.5 m 4 PCS 2896 mm x 2438 mm x 12192 mm
Hoisting Precautions
Stage
Precautions
Before hoisting Ensure that the crane and steel ropes provide the required
bearing capacity.
Ensure that the twistlocks in container bases are in correct
positions.
Ensure that the steel ropes are securely connected.
During hoisting Do not allow any unauthorized people to enter the
hazardous areas and never stand under the crane arm
during hoisting.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 4 Installing a Pre-fab. Module
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 43