6 Installing External Pipes for Smart
Cooling Products
This chapter describes only how to install the water rell pipes for the outdoor
unit compartment of the FusionDC1000. The water rell pipes outside the pre-fab.
module are routed and installed depending on onsite situations under the
guidance of onsite supervisors.
Context
Rell water to humidiers in real time when the cooling system is operating to
ensure normal system operation.
NO TICE
When the system is operating, ensure that the automatic water rell valve has the
water source available with the water pressure of 0.1 MPa to 0.7 MPa.
Preparations
Tools: hacksaw, protective gloves, hot melt device
Materials: DN25 PP-R pipe (with an outer diameter of 25 mm, to be purchased
onsite), bend, straight connector, 10 mm thick thermal insulation foam
Skill requirement: skilled technician
Procedure
Step 1 Open the rear door of the pre-fab. module.
Step 2 Open the compartment door of the smart cooling product on the right.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
6 Installing External Pipes for Smart Cooling
Products
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 57

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals