Figure 7-8 Removing the transport fasteners on the top of the UPS cabinet
and SmartLi
----End
7.3 Removing Sliding Door Fasteners
Preparations
Tool: adjustable wrench
Materials: none
Skill requirement: common technician
Context
The three hot aisle sealing doors and the door between the entrance hall and the
equipment compartment in a pre-fab. module are all glass sliding doors. Fasteners
are installed on the glass sliding doors to prevent the doors from being damaged
during transportation.
After the pre-fab. module is installed and secured, the fasteners need to be
removed so that the sliding doors can work properly.
NO TE
Keep the removed sliding door fasteners for future use in case the pre-fab. module needs to
be relocated.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 7 Removing Transport Protection Materials
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 66

Table of Contents

Other manuals for Huawei FusionDC1000A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionDC1000A and is the answer not in the manual?

Huawei FusionDC1000A Specifications

General IconGeneral
BrandHuawei
ModelFusionDC1000A
CategoryStorage
LanguageEnglish

Related product manuals