Figure A-7 Connecting the hose to the DPJ end connector
Step 5 Screw the ferrule into the plastic-coated metal hose.
Figure A-8 Installing a DPJ end connector
Step 6 Route the cable into the pre-fab. module through the body of the DPJ end
connector.
NO TICE
People inside and outside the pre-fab. module should work together to route
the cable to the
specied connection position inside the pre-fab. module.
To facilitate operation during internal routing, you can remove some top plate
in the pre-fab. module aisle.
Step 7 Connect the ferrule to the body and tighten the cover lock nut using the dedicated
feeder window wrench.
Step 8 Apply sealant on the joint between the DPJ end connector and the sheet metal on
the pre-fab. module.
Figure A-9 Applying sealant
Step 9 Spray water to test the waterproof performance of the DPJ end connector.
----End
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) A Basic Installation Operations
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 113

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals