Figure 2-5 Pipe anti-freezing solution
(1) Trap (2) Electric heating belt
(3) Water rell pipe (4) Drainpipe
(5) Soil
NO TICE
Prepare traps for pre-fab. module drainpipes.
The ends of the drainpipes should be connected to the utility drainpipes.
Figure 2-6 Requirements for wrapping the electric heating belt
NO TICE
The electric heating belt needs to be wrapped around the drainpipe and water
rell pipe evenly during onsite installation.
Wrap the electric heating belt before wrapping the thermal insulation foam.
Ensure that the thermal insulation foam covers the electric heating belt. The
thermal insulation foam must be able to withstand a temperature higher than
200°C.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 2 Site Requirements
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 21