Figure 4-16 Installing a ground lug
NO TE
In addition to using ground lugs, you can also connect ground cables to pre-fab. module ground
points using M12x30 stainless steel bolt assemblies, as shown in the following gure. Ground
cables can be routed through plastic-coated metal hoses for protection based on site
requirements.
Figure 4-17 Installing a ground cable
----End
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 4 Installing a Pre-fab. Module
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 47

Table of Contents

Other manuals for Huawei FusionDC1000A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionDC1000A and is the answer not in the manual?

Huawei FusionDC1000A Specifications

General IconGeneral
BrandHuawei
ModelFusionDC1000A
CategoryStorage
LanguageEnglish

Related product manuals