Figure 7-3 Removing the liquid level detector fasteners
Step 4 Reinstall the water pan cover.
Step 5 Verify the connection of the interconnection terminal of the low liquid level
detector.
Figure 7-4 Connect the interconnection terminal.
FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario) 7 Removing Transport Protection Materials
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 62