EasyManua.ls Logo

Huawei SmartLi 3.0 - Page 74

Huawei SmartLi 3.0
171 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-4 Securing the sliding plate to the pallet
Step 5 Raise the anchor bolts to the highest position using an adjustable wrench
NO TICE
When raising the leveling feet, at least one person is required to hold the cabinet
to prevent it from sliding.
Figure 5-5 Raising the anchor bolts to the highest position
Step 6 Slowly move the cabinet over its castors to the installation position.
Step 7 Take out the desiccant.
----End
SmartLi 3.0
User Manual (Short-Term Backup Power) 5 Installation and Cable Connection
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 65

Table of Contents

Related product manuals