Figure 5-38 Installing battery bae plates and testing the insulation performance
(using the 7+7 scenario as an example)
(1) Battery bae plate (2) Negative terminal (3) Positive terminal
Step 4 Install battery communications cables and a cover at the last but one layer of the
right column.
In the half-capacity cabinet scenario, connect the cable reserved on the rightmost side of
the cabinet when you install a communications cable at the bottom layer.
To prevent the communications cable from being damaged, place the cable in the
buckle when connecting the cable, and then close the front cover of the battery
module.
SmartLi 3.0
User Manual (Short-Term Backup Power) 5 Installation and Cable Connection
Issue 10 (2024-01-31) Copyright © Huawei Digital Power Technologies Co., Ltd. 89