EasyManua.ls Logo

Husqvarna P524 - Electrical and Hydraulic Systems; Electrical System Overview

Husqvarna P524
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English – 37
Propulsion
5.2.9 Hydrostatic cable
Tools Dimension
Combination wrench 10 mm
Flat-blade screwdriver
Hydrostatic cable adjustment
The hydrostatic cable may require adjustment after
adjusting the tension of the pump belt.
The hydrostatic cable (left side) can be adjusted as
follows:
1. Take apart the ball joint, which is locked with a
locking spring.
1
2
2. Make sure the forward drive pedal is depressed
fully.
3. Bend the vertical arm clockwise to the maximum
position and check that the ball and socket in the
ball joint are aligned.
NB!
Make sure the locking spring goes through
both holes in the ball socket.
If adjustment of the hydrostatic cable is insufcient, a
further adjustment can be made with the cable
adjuster next to the hydraulic pump.
Loosen the locknuts (1) and adjust the play with the
adjustment screw (2).
Make sure the pump does not bottom when the
pedals are fully depressed.
4. Adjust the ball socket on the cable as required
so that it ts precisely over the ball on the lever
arm.
5. Screw the ball joint back 2 turns.
6. Assemble the ball joint.
7. Ret the ball joint lock spring.
8. Tighten the locking nut for the ball socket on the
cable.
1
1
2

Table of Contents

Other manuals for Husqvarna P524

Related product manuals