EasyManua.ls Logo

Intellian GX100NX - Planning Installation

Intellian GX100NX
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Planning Installation
Antenna Control Unit (ACU) (Optional: for Dual Antenna
System)
In Dual Antenna System, the secondary antenna needs to be connected to non-Core Module installed Antenna
Control Unit (ACU) instead of BDT. The following functions are supported by ACU.
High power supply for the high power BUC
Spectrum analyzer function included
OLED display
USB Log download & Firmware upgrade (No PC required)
Wi-Fi acess
AptusNX Web application
Figure: Front Panel of ACU
Figure: Rear Panel of ACU

Table of Contents

Related product manuals