EasyManua.ls Logo

Interroll MultiControl - Handover (Handshake-Signals)

Interroll MultiControl
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial start up and operation
Version 3.0 (08/2018)
Translation of original instruction manual 29
IP addresses of neighbour MultiControls (for ZPA and ZPA + programs)
IP address upstream: Address of the MultiControl to be taken over by the conveyed items
IP address downstream: address of the MultiControl to the conveyed items
Determine if the PLC data is in big-endian format
To apply the changed parameters to the MultiControl, press the "Submit" button.
NOTICE
Destruction of the MultiControl due to premature shutdown of the supply voltage
Ensure that the power supply is uninterrupted during the change of bus type until the
restart is complete. Duration of the process about two minutes.

Table of Contents

Other manuals for Interroll MultiControl

Related product manuals