Initial start up and operation
Version 3.0 (08/2018)
Translation of original instruction manual 29
• IP addresses of neighbour MultiControls (for ZPA and ZPA + programs)
IP address upstream: Address of the MultiControl to be taken over by the conveyed items
IP address downstream: address of the MultiControl to the conveyed items
• Determine if the PLC data is in big-endian format
Destruction of the MultiControl due to premature shutdown of the supply voltage
➢ Ensure that the power supply is uninterrupted during the change of bus type until the
restart is complete. Duration of the process about two minutes.