EasyManuals Logo

ITT HYDROVAR Series User Manual

ITT HYDROVAR Series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #75 background imageLoading...
Page #75 background image
74
The following 3 parameters are responsible for starting the lag pumps and for calculation
of the new required value as well.
0505
0505 ACT.VAL.INC.
0.35 Bar
Lift Value
Possible settings: 0.00 – to the pre selected sensor range
0510
0510 ACT.VAL.DEC.
0.15 BAR
Fall Value
Possible settings: 0.00– to the pre selected sensor range
0515
0515 ENABLE FRQ
48.0 Hz
Enable frequency for the next power unit
Possible settings: 0.0 – 70.0 Hz
Using this parameter the desired release frequency for the following pumps can be
selected. If a pump in the system reaches this frequency and the system pressure drops
below the REQUIRED VALUE [02] - ACTUAL VALUE DECREASE [0510], the next pump is
switched on.
0520
0520 ENABLE DLY
5 sec
Enable delay time (For Cascade Relay Only!)
Possible settings: 0 – 100 sec
If the above parameters for switching on a follow up pump are satisfied, the follow-up-
pump will start after this selected time.
0525
0525 SW DELAY
5 sec
Switch Delay (For Cascade Relay Only!)
Possible settings: 0 – 100 sec
Delay Time between two switching actions of the follow-up-pumps.
That parameter prevents the system against repeated switching actions caused by the
variation of the consumption.
S
S
S
S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITT HYDROVAR Series and is the answer not in the manual?

ITT HYDROVAR Series Specifications

General IconGeneral
BrandITT
ModelHYDROVAR Series
CategoryControl Unit
LanguageEnglish

Related product manuals