Site Preparation Checklist for an ACX5000 Router
The checklist in Table 23 on page 78 summarizes the tasks you need to perform when preparing a site for
an ACX5000 router installation.
Table 23: Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Environment
“ACX5000 Router Environmental
Specifications” on page 83
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
Measure the distance between external
power sources and router installation site.
“AC Power Specifications for an
ACX5000 Router” on page 73
Calculate the power consumption and
requirements.
Rack or Cabinet
“Rack Requirements for an
ACX5000 Router” on page 86
“Cabinet Requirements for an
ACX5000 Router” on page 85
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the router.
“Clearance Requirements for
Airflow and Hardware
Maintenance for an ACX5000
Router” on page 81
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables