EasyManua.ls Logo

Kioti RX8030 - Adjustment of Top Link; Precaution for Installing; How to Use Top Link Holes

Kioti RX8030
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
-
6
RX6030 / RX7030 / RX8030
(1) Top Link (2) Set Pin
(3) Retainer Pin (4) Top Link Handle
1. Install the top link to the desired
position, and install the pin and re-
tainer pin.
2. Unscrew the lock nut of the top link
hole end. To increase the length,
turn the top link handle clockwise.
To decrease the length, turn it
counterclockwise. Finally, secure
the top link with the lock nut.
M55O619A
ADJUSTMENT OF TOP LINK PRECAUTION FOR INSTALLING / HOW TO USE TOP LINK HOLES
M55O620A
(1) Top Link
When attaching an implement, con-
nect it according to its draft as follow:
·A : Draft is not required.
·B : Heavy load traction work
·C : Normal load traction work
1. Adjust an angle of the implements
to the desired position by shorten-
ing or lengthening the top link.
2. Adjusting top length varies accord-
ing to the type of implements used.
A plate describing how to at-
tach the implement is placed
on the standard implement of
our company.
When you are attaching an
implement not requiring draft,
mount the top link into hole A.
When you are attaching an
implement (like plow) requir-
ing some traction, mount the
top link into the hole B or C.
When moving with an imple
-
ment attached, make sure to
set the top link to the hole "A"
or place the draft control le-
ver to the foremost (deepest)
position. Otherwise, the draft
control system may operate,
resulting in damage to the lift-
ing control section or uninten-
tional lowering of the imple-
ment by it self.
CAUTION
TF120(RX6030,7030,8030)-AU-06.in6 6 2015-10-29 오후 2:26:34

Table of Contents

Related product manuals