EasyManua.ls Logo

Kostal PLENTICORE plus - Page 80

Kostal PLENTICORE plus
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80
4
© 2018 KOSTAL Solar Electric GmbH
Operation and operating the device
When working on the DC feed cables
When working on the DC feed cables, the inverter must
be completely de-energised.
It is absolutely essential that these steps are taken in
addition to those stated previously:
1. If present, switch o the connected battery
storage.
2. Disconnect all DC connections on the inverter. To do
this, unlock the engaging clips with a screwdriver and
disconnect the plug.
1
1.
2.
Fig. 40: Disconnecting SUNCLIX DC plug
3. Ensure that all connections are voltage-free.
H
The inverter is now completely voltage-free. Work
on the inverter or on the DC feed cables can now be
carried out.
DANGER
RISK OF DEATH DUE TO ELECTRI-
CAL SHOCK AND DISCHARGE!
De-energise all devices and secure
them against being switched on
again.
INFO
You will find a detailed description of
how to switch o the battery storage
in the operating manual provided by
the battery manufacturer.
1
You can find information about the Sunclix
installation specification at:
www.phoenixcontact.com
2
3
4
5
6
7
8
9
10
11
12
13
1

Table of Contents

Other manuals for Kostal PLENTICORE plus

Related product manuals