EasyManua.ls Logo

Kostal PLENTICORE plus - Page 9

Kostal PLENTICORE plus
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
1
© 2018 KOSTAL Solar Electric GmbH
General information
Exclusion of liability
Any use that diers from that described in Ch. 1.1 or
goes beyond the stated intended purpose, is consid-
ered inappropriate. The manufacturer accepts no liability
for any damage resulting from this. Modifications to the
inverter are prohibited. The inverter may only be used if
it is safe to operate and is in a technically perfect condi-
tion. Any instance of misuse will result in the termination
of the warranty, guarantee and general liability of the
manufacturer.
Only a qualified electrician may open the device. The
inverter must be installed by a trained electrician (accord-
ing to DIN VDE 1000-10 or BGV A3 accident prevention
regulations or an internationally comparable standard)
who is responsible for observing the applicable stand-
ards and regulations.
Work that could aect the electrical power system of
the relevant energy supply company at the site of the
solar power feed-in, may only be carried out by qualified
electricians expressly authorised (licensed) by the energy
supply company. This includes changes to the facto-
ry-preset parameters. The installer must always observe
the regulations of the energy supply company.
Factory settings may only be changed by qualified elec-
trical installers or persons with at least comparable or
higher technical qualifications, e.g. foremen, technicians
or engineers. When doing so, all requirements are to be
observed.
IMPORTANT
INFORMATION
The inverter may only be installed,
maintained and repaired by a
trained and qualified electrician.
The electrician is responsible for
ensuring that the applicable stand-
ards and regulations are observed
and implemented. Work that could
aect the electrical power system
of the relevant energy supply com-
pany at the site of the solar power
feed-in, may only be carried out
by qualified electricians expressly
authorised (licensed) by the energy
supply company.
This includes changes to the facto-
ry-preset parameters.
2
3
4
5
6
7
8
9
10
11
12
13
1

Table of Contents

Other manuals for Kostal PLENTICORE plus

Related product manuals