SUPERSTRUCTURE OPERATION
108
Operating instructions • Semitrailer • 505369471-04 • 02/2019
Fig.6-87: Tilting/plug-in post
1 External beam guide
2 Tilting/plug-in post
3 Post retainer
þ The centre posts are prepared for re-
moval (see "6.3.2 Centre posts", pg.107).
► Tilt the posts from the external beam
guides on the roof frame.
Fig.6-88: Lifting out the tilting/plug-in post
1 Tilting/plug-in post
2 Post retainer
► Lift out the posts from the post retainer
on the chassis.
ü The posts have been removed.
Inserting the tilting/plug-in posts
► Insert the posts in the post retainer on
the chassis.
► Tilt the posts into the external beam
guides on the roof frame in the vertical
position.
ü The posts have been inserted.
► Fold up the board walls and lock them.
6.3.2.2 Fold-down posts
Fold-down posts have several sets of lath
sockets for plug-in laths.
Removing fold-down posts
CAUTION
Risk of injury due to falling posts!
The top part of the post can fall down and
injure people and cause material damage
when removing the fold-down posts.
► Proceed with the utmost caution when
lifting out the posts.
þ The centre posts are prepared for re-
moval (see "6.3.2 Centre posts", pg.107).
Fig.6-89: Fold-down post
1 External beam guide
2 Top part of the post
3 Locking lever on the bottom part of the
post
► Press down the locks on the locking
lever.
► Pull out the locking lever.
► Completely fold down the locking
lever.