32 CHAPTER 3
Maintenance
Figure 32. Ball valves with
extension hoses
• In this case, the operator
has to open the valves
(quarter turn) to proceed
with the draining.
3. Close the valve and repeat the
procedure for all the other valves
(if there’s more than one
installed on the truck).