EasyManua.ls Logo

Laguna Tools PP16 XC Pro - Cleaning & Checking Schedule

Laguna Tools PP16 XC Pro
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. MACHINE MAINTAINESS
39
Cleaning & Checking Schedule
Check
items
Daily
Weekly
Monthly
3
-
month
6
-
month
yearly
Check emergency stop and
indicate lamp whether normal
or not?
Check the integrity of noise,
pressure and ventilation of the
machine.
Clean the exterior part of the
machine
Check all the screws from the
machine whether tight or not?
Check screws and nuts of limit
switch whether tight or not?
Check all wires and electric
connections near the power
switch to see if there have any
Check belt running normal or
not? If any break or failure,
replace it.
Check the load voltage and
current of the motor
Check the continuity of all the
wires
Clean the interior part of the
electrical box and check the
continuity of the wires.
Tighten the terminal screws of
the power supply wires in the
control box
Any worn or damaged parts
and unsafe condition.
Clean & vacuum dust buildup
from inside cabinet.

Table of Contents