INSTALLATION
19
5.0 Installation Instructions
Read the Installation section and do the steps in sequence.
Note: Illustrations are for reference only.
Note: Functions, descriptions and data can be different on your machine. Refer to Section 3 Options.
Note: Make sure that only qualified personnel complete the steps for Installation, Maintenance and
Troubleshooting.
WARNING
Obey all safety decal instructions and warnings.
CAUTION
Complete the installation before you apply the power to the machine.
CAUTION
Obey the torque specifications to prevent damage to the fasteners. Too much
torque can cause the fasteners to loosen.
Note: The “exposed” metal parts on all Stretch Wrap Machines have a heavy Rust Preventative
applied before shipment.
You can use Mineral Spirits or a similar cleaner to remove it.
If you remove it, make sure that you apply a “light” Rust Preventative to the “exposed” metal before
you operate the machine.
The space requirements can be different on each machine.
Refer to your machine dimensions when you prepare for the installation.
Make sure that the mast has a clearance of a minimum of 762 mm (30”) to the nearest blockage.
A flat and level floor – no more than 6 mm (¼”).
Make sure that the floor can hold the weight of:
• The machine
• The maximum load weight
• Forklift
• Pallet Jack
• Other equipment in the area
• Personnel