EasyManuals Logo

Lantech QL-400 User Manual

Lantech QL-400
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
OPERATOR INSTRUCTIONS
65
WARNING
Obey all safety decal instructions and warnings.
6.7 Thread the Film
1. Push the E-stop.
2. Refer to the illustration below and make sure that the film roll is in the correct position.
1
Open the EZ Thread Gate
2
Thread the film between the Mast and the Top Guard and between the Rollers
3
Close the Gate
4
The Tackifier is on this Side
Thread the Film
The standard film roll is 254 mm (10”) in diameter and 508 mm (20”) in width.
1. Move the FDS up until Pallet Grip disengages.
2. Push the E-stop.
3. Look for damage on the film roll.
4. Put the film roll on the film post.
5. Release the latch on the EZ Thread gate.
6. Pull out 914 1219 mm (3’ - 4’) of film and twist it into a rope. (See illustration below)
7. Refer to the diagram and thread the film.
8. Close the gate. The film must be loose to make sure that it does not break.
9. Reset the E-stop.
10. Push Reset.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lantech QL-400 and is the answer not in the manual?

Lantech QL-400 Specifications

General IconGeneral
BrandLantech
ModelQL-400
CategoryStretch Wrapping Systems
LanguageEnglish